What points should be paid attention to when installing the aluminum grille ceiling?
Author: Camer metal ceiling aluminum curtain wall EDIT: Xiaojia 13074271912 Source: Issue Date: 2021.08.30
Information Abstract:
With the passage of time, the application of aluminum grille suspended ceilings has become more and more extensive. Many commercial buildings have adopted aluminum grille suspended ceilings. What points should be paid attention to when installing aluminum grille suspended ceilings? Let Kaimai Xiaobian come today...

Aluminum grille ceilingWhat points should be paid attention to during installation?

       随着时间的推移,Aluminum grille ceiling的应用也越来越广泛了,不少的商业建筑都采用了Aluminum grille ceilingWhat are the key points to pay attention to when installing the aluminum grille ceiling? Let\'s do it today. Kaimai XiaobianTake you allGet to know.

Aluminum Grille Ceiling (31)

1Installation of boom: steel bars are welded to reserved steel bars.

2. Install the keel: pull out the ceiling elevation line according to the top control line of the keel, the relationship between the top surface of the keel and the bottom surface of the ceiling, and then use the suspension parts to adjust the height and height of the keel until the requirements are met.

3, Install the grille: First use thin nylon threads to pull out the cross plane reference line. Starting from the corner, install the split ceiling with a height slightly higher than the elevation line, and temporarily fix the split ceiling.When the ceiling is adjusted according to the reference line, when the ceiling area is larger 100m2When, the ceiling surface should have a certain arch, the number of arches is generally about the span.1/3000. Fix the flat arm first, and then fix the joint with the joint.  

Aluminum Grille Ceiling 41

4, Overall adjustment: Pull out multiple parallel or vertical reference lines along the elevation line, adjust the ceiling as a whole according to the baseline, and check whether the arch amount on the ceiling surface is correct. Check the installation and layout, and correct the deformation of the equipment itself according to the installation situation. Check whether the fixed parts of each joint are reliable, and strengthen the parts where the force is concentrated.

       看到这里,想必你对Aluminum grille ceilingThe material has a further understanding. Want to know more, welcome to continue to pay attention to this station!

 


Responsible editor: Kaimai aluminum grille ceilingManufacturer-Huang Liping13074271912

本文标签:Aluminum grille ceiling,Triangular aluminum grille ,Aluminum grille manufacturers, Aluminum grille ceiling

All rights reserved(Kaimai metal ceiling aluminum curtain wall) reproduced please indicate the source

 

National Service Hotline

0130-7427-1912 86-13074271912