Kaimai takes you to understand different aluminum veneer ceiling installation
Author: Xiaojia 13074271912 EDIT: Kaimai metal ceiling aluminum curtain wall Source: Kaimai Building Materials Release Date: 2022.02.21
Information Abstract:
Aluminum veneer ceiling construction: 1 construction process measurement and positioning → keel installation → secondary measurement → aluminum plate deepening design → aluminum plate processing and manufacturing → aluminum plate installation → gluing (no gluing is required for close spelling) → cleaning and sanitation, acceptance 2...

Understand the aluminum veneer ceiling installation, this article is enough

铝单板吊顶施工:
1 Construction process

Measurement and positioning → keel installation → secondary measurement → aluminum plate deepening design → aluminum plate processing and manufacturing → aluminum plate installation → gluing (no gluing is required for close assembly) → cleaning, sanitation and acceptance

Aluminum veneer curtain wall 45

2 施工要点
(1) Measurement and positioning: use total station, level, level, steel tape and other tools to measure the keel construction reference point. After the skeleton is installed, the aluminum plate unit dividing line is measured on the keel as the basis for the secondary deepening design of aluminum plate and the installation of aluminum plate.
(2) Installation of aluminum veneer frame: According to the design and division of suspended ceiling aluminum veneer, suspended ceiling keel can be in the form of rectangular steel pipe keel, combination of primary and secondary keels, or in the form of boom and light steel keel. After the keel is installed, measurement and review shall be carried out, and its axis and elevation shall meet the requirements before it can be transferred to the next process.
(3) The actual measurement of the installed skeleton, according to the model and the measurement data, with the help of CAD to draw the processing large sample, and the template and processing large sample to the manufacturer for semi-finished processing.
(4) Aluminum veneer installation: clean up the installation position, install the aluminum plate and adjust the size to be accurate and the appearance is neat, then fix it on the keel with self-tapping screws from the side of the aluminum veneer, or fix the aluminum veneer by overlapping the plates. Fine correction after initial setting.
(5) Glue cleaning: clean all gluing parts such as aluminum plate and keel, paste protective adhesive tape at the edge of the material, fill foam strips, fill sealant, and compact and scrape the sealant with a special scraper. If the aluminum veneer is tightly seamed, the uniformity of the gap shall be controlled.

(6) Clean all exterior decorative surfaces after performance and size inspection of the parts to be cleaned to meet the decoration requirements.

Aluminum veneer curtain wall 17

3 质量标准

Standard Points
(1) The measurement of suspended ceiling line at the subway entrance shall be carried out under the condition that the wind force is not more than level 4. During line setting-out and installation, the previous process shall be checked to prevent accumulation of errors.
(2) The keel should be tightened in time after adjustment.
(3) All kinds of connectors shall be treated with rust removal and galvanizing, and the installation of connectors shall be stable and reliable.
(4) The installation verticality, flatness and horizontal and vertical measured qualified rate of lines must reach more than 90% without pollution, and the colors must be consistent.
(5) At present, there is no industry standard for the installation quality of aluminum veneer, so the quality inspection standard for aluminum veneer installation as shown in Table 1 is formulated on the basis of the quality standard for the installation of the cover panel in the Construction Engineering Quality Inspection and Evaluation Standard (GBJ301-88). Each batch of sampling 10%, if the installation quality deviation exceeds the specified standard, should take timely measures to correct.

Allowable deviation and inspection method for aluminum veneer ceiling engineering
Test method for deviation value (mm) of serial number items
1 Primary and secondary keel flatness 1 Foot or feeler gauge
2 Joint height difference 1 Ruler or feeler gauge
3 Verticality 2 Ruler or feeler gauge
4 Slope 1 level
5 Aluminum veneer flatness 1 rule or feeler gauge
6 Verticality 2 Foot
7 Slab seam height difference 1 foot
8 Yin and Yang Angle Square 2 Yin and Yang Angle Square rulerAluminum veneer curtain wall 26

Quality Critical Control Points:
(1) The keel of the aluminum plate suspended ceiling located at the entrance and exit of the subway shall be completed with hot-dip galvanized steel with a thickness of 3mm or more, which can effectively resist the damage to the suspended ceiling caused by negative pressure brought by outdoor airflow;

(2) Control the joints between the dense aluminum veneer panels to be uniform in size, and prohibit openings caused by irregular and irregular panels. Therefore, strengthen the standardization of board surface production and pay-off installation.

责任编辑:凯麦aluminum veneer curtain wall厂家

This article labels: aluminum veneer curtain wall specifications, aluminum veneer curtain wall technology, aluminum veneer curtain wall installation, Kaimai aluminum veneer manufacturer