Process flow of aluminum grille ceiling installation
Author: Camer metal ceiling aluminum curtain wall EDIT: Xiaojia 13074271912 Source: Issue Date: 2021.07.16
Information Abstract:
Today\'s aluminum grille has become the focus of many ceiling decoration choice of aluminum ceiling building materials products, especially in the shopping mall can almost see the figure of aluminum grille, then you know how to install the aluminum grille is good-looking...

关于Aluminum grille ceilingInstallation process 

      当今Aluminum grilleHas become a lot of ceiling decoration focus on the choice of aluminum ceiling building materials products, especially in the mall almost can see the figure of aluminum grille, then you know how to install the beautiful aluminum grille!

1Construction procedure:

  一开始是测量放线和进行技术交底以及是安装吊杆,然后检查机电设备的管道安装和检查检修道的安装,接下来就是安装Aluminum grille1. Install air outlet lamps and lanterns, and finally level them for acceptance.

Aluminum Grille Ceiling (30)

2Key points of construction:

(11) The measured setting-out. It is mainly the high line of the bullet mark and the layout line of the keel, as well as to check whether the mechanical and electrical pipelines and decorative ceiling can meet the design requirements, and it is also necessary to formulate the construction plan.

    2)吊杆安装。这个间距主要是看龙骨的布置,因为Aluminum grille ceilingto the main keel interval is in 600mm, while the long keel boom spacing is1000Millimeters, so when the boom is connected with the equipment, the lifting point cannot be set on the equipment support. It is also necessary to adjust the lifting point and structure or add a lifting stalk to ensure the quality of the ceiling. Usually, the method of adjusting the lifting point structure is to weld and burn the angle steel frame. The boom also needs to have sufficient load carrying capacity. Finally, when the embedded hanger rod needs to be extended, the overlapping parts must be welded firmly and the weld seam must be uniform and full. In the fixing method of the boom and the building structure, plates or beams are mainly used, and then expansion bolts are used to fix the angle code. The boom is hung on the angle code, and special spring plates and hooks are installed.

Aluminum Grille Ceiling (16)

     3)检查机电。需要检查天花上面的通风和消防等电器线路有没有安装好,有没有完成试压试、保温、防腐等工作以及是在天花检修道上面有没有安装好。等这些工作完成后,就可以进行下面Aluminum grille ceilingInstallation work.    

     4Aluminum grille ceilingInstallation. According to the process drawing, buckle installation and side keel installation shall be carried out, and then other equipment shall be installed. Special attention shall be paid to leveling grid ceiling.

      3、金属Aluminum grille ceilingPrecautions for installation:

(1) In the gap of the lifting point of the main keel, the design of ceiling needs to be selected according to different metals, especially in the middle part, and the arching height of the metal keel is generally larger than the short span of the space. l 200, And after the main keel is installed, the position and elevation need to be corrected in time. And the gap between the boom and the end of the main keel can not exceed300 Mm, otherwise you need to add a boom, in order to avoid the main keel falling.

(2) It needs to be installed close to the main keel on the secondary keel, especially at the joint of the plate, and must be installed at a width of not less40 mm on the secondary keel.

Aluminum grille ceiling (20)

     34) The side keel shall be fixed on the surrounding wall according to the design requirements.

     41) Fully adjust the position and levelness of the primary and secondary keels. The installation should be misplaced on the connector. Especially in the long keel connection of the place of docking dislocation deviation can not exceed 1 mm. Then, after adjustment, all hangers and connectors of the keel need to be tightened. Check and install the suspended ceiling framework, which should be firm and reliable.

     5) Equipment and lighting also need to be opened with elastic lines, because this is related to the effect of ceiling decoration. Therefore, the surface of the ceiling needs to be well connected with the automatic sprinkler, smoke detector, tuyere, lamps and other equipment, and the installation should also be consistent.

     6) The plate shall be applied to the sealing of the edge keel at the inspection hole, vent, and the junction with the wall surface or cylinder surface. Especially because the parts of the hole are related to the closing on both sides, it is necessary to use the keels of the two sides for back-to-back, and then fix it with pulling rivets. It is best to form a frame according to the size of the reserved opening.

 

责任编辑:凯麦Aluminum grille ceilingManufacturer- Huang Liping13074271912

This article label: aluminum grille ceiling,Triangular aluminum grille,Aluminum grille manufacturers ,Aluminum grille ceiling