Stations and subways are transportationProduction base, passengerRide and Lide, CargoCarriage, train To-depart and decomposition, locomotiveand crew preparation and transfer, train inspection and cargo检查,都在车站办理,更是利用Aluminum strip gusset ceiling The lines should highlight the wide characteristics of the station and subway, so as to reflect the sense of architectural quality.Aluminum strip gusset ceilingHow did you install it? The following is compiled by a small editor.Aluminum strip gusset ceilingInstallation steps:
Station subway aluminum gusset ceiling ceiling installation first step: preparation tools
在安装Aluminum strip gusset ceiling Before, we should first check the design drawings of the aluminum bar buckle ceiling, so as to understand the specific positions of lamps and vents that need to be reserved, and pay attention to some details of the aluminum bar buckle ceiling. The most important thing is to prepare in advance the installation needs to use the parts and all kinds of tools, such as raw material keel, boom, plate, etc., tools are hacksaws, screwdrivers, impact drills, nail guns, etc., parts including hanging plug-ins, hangers, connectors, nails, self-tapping screws, etc.
The second step of installation of aluminum strip gusset ceiling ceiling for subway station: positioning elastic line
对照铝条扣吊顶设计图纸,在墙、顶面确定吊顶安装的具体位置并弹线定位了。根据楼层的标高水平线,利用标尺竖向量至顶面确定出标高位置,然后以房间中心点为基点,沿着标高水平,在墙面弹出铝条扣吊顶龙骨分档的位置线。弹线Aluminum strip gusset ceiling Be sure to ensure clarity, the deviation of the position should not exceed ± 5mm, so that the aluminum strip ceiling can be accurately installed.
Installation of aluminum strip gusset ceiling for subway station Step 3: Installation of aluminum strip ceiling keel
Aluminum strip gusset ceiling After the main keel is completely installed, the aluminum strip gusset ceiling ceiling sub-keel needs to be installed. Same as the main keel of the aluminum strip gusset ceiling ceiling, the secondary keel needs to be assembled at the corresponding position first. The specific location of the hanging parts needs to be determined according to the sub-gear line of the sub-keel and the spacing with the main keel, and the general spacing is 600mm. Then, the secondary keel is fixed on the main keel through the C- type aluminum strip plate hanger. If the secondary keels need to be connected to each other due to the length problem, a special connecting piece can be used for connection at this time to ensure that it is straight and then fixed.
Station subway aluminum gusset ceiling ceiling installation step 4: install aluminum gusset
When installing, it is necessary to determine the reference line along the secondary keel in the middle position, and then extend the installation from the middle to both sides according to the position of the reference line. The installation method is relatively simple, directly follow the flanging position of the aluminum strip buckle, gently clip the plate into the secondary keel, and slowly push it tightly. For the side aluminum plate, it can be fixed by the edge aluminum buckle. When installing the aluminum strip gusset plate, you must take it lightly to avoid the plate surface being damaged and cannot be repaired.
如果您对以上Aluminum strip gusset ceiling If you are interested or have any questions, please click to contact our online customer service, or call: 13074271912, Kaimai Building Materials-Do a good job in the ceiling!
Responsible editor: Kaimai aluminum gusset ceiling manufacturer-Huang Liping 13074271912
This article labels: aluminum strip buckle, C- type aluminum strip buckle, strip buckle aluminum ceiling, Kaime aluminum strip buckle manufacturer
Copyright (Kaimai aluminum gusset ceiling aluminum curtain wall) reproduced please indicate the source
National Service Hotline
0130-7427-1912 86-13074271912Advisory Hotline