Analysis of risk management methods and control measures for aluminum veneer curtain wall projects
Author: Camer metal ceiling aluminum curtain wall EDIT: Xiaojia 13074271912 Source: Release Date: 2020.12.19
Information Abstract:
1. Formulate a scientific and reasonable construction plan. According to the actual characteristics and difficulties of the project, reasonable construction procedures and construction sequences should be arranged during the construction process, and construction working faces should be provided as much as possible to make various...

aluminum veneer curtain wallEngineering risk management method control measures analysis.

1, formulate a scientific and reasonable construction plan

According to the actual characteristics and difficulties of the project, reasonable construction process and construction sequence should be arranged during the construction process, and construction working face should be provided as much as possible, so that all sub-projects can be crossed. At the same time, the use of professional network software, the development of the overall network control program, determine the key lines, determine the control points during the implementation of the plan, and the plan is divided into monthly weekly and daily operating plans. In order to realize the shelf life system during the construction period, the overall insurance plan for weekly and weekly insurance months.

2. Regular inspection management plan

According to the schedule date, check the actual progress in time, and determine the progress control points for each period accordingly. Analyze and compare the actual progress and the planned progress, and use the microcomputer to adjust the plan in time. When implementing the two key points of key processes and setting control points, once the key processes are delayed, they are adjusted in time by effective methods such as increasing input or appropriately extending daily operation time.

Aluminum veneer curtain wall (10)

3, with the team with the same construction experience, actively use new technology, optimize the construction plan

Engineering construction enterprises shall give full play to their talents and be equipped with professional, skilled and competent engineering management teams with similar engineering construction experience, as well as a sufficient number of skilled workers to meet the requirements of various engineering skills. The construction team can quickly understand the technical requirements of the project and improve the installation efficiency. Second, in the process of engineering construction, the construction unit should make full use of the construction drawings, deepening technology, computer sampling and discharge technology, laser (total station) measurement technology, quality management and quality assurance and other technical advantages, computer and software applications, etc., in order to develop the most optimized construction plan.

4. Ensure that there is a plan to ensure the construction period of the project in terms of materials, equipment, funds, etc.

During the construction process, the quantity plan of engineering materials, components and related equipment shall be prepared according to the material analysis of the construction schedule and construction budget, as the basis for ordering and preparation, and the area of warehouse, courtyard and organization of transportation shall be provided and determined. Enter the site in batches according to the plan, and do a good job of acceptance, distribution and storage. In addition, the company has a good reputation for achieving friendly cooperation with relevant suppliers to ensure that engineering materials are produced and processed first, and to ensure target duration. In addition, these funds are earmarked for special purposes. The project manager is responsible for ensuring that the funds achieve the objectives of the construction period in a timely manner, supervising the formulation of the fund use plan, simplifying the approval procedures of various funds, and making the project funds sufficient and timely.

Aluminum veneer curtain wall (16)

5. Pre-control of engineering installation quality and safety

       企业需要注重aluminum veneer curtain wallThe characteristics of engineering installation quality, in the following aspects to do a good job in the control of key nodes. The first is the pre-burial (or post-burial). The connection with the front burial (or post-burial) is the foundation of the aluminum veneer curtain wall and the basic guarantee of safety. Therefore, it is necessary to strictly check the inspection of the installation position size and the installation quality. Second, all concealed works must go through project acceptance before sealing up, and the next step can only be carried out after submitting a qualified acceptance report. Third, the construction unit should conduct self-inspection of each project and construction quality, and check each other according to the weekly report to the company\'s project management department. In the process of on-site inspection, once problems are found, they should be corrected in time.

       aluminum veneer curtain wallIt has a highly respected position in the building decoration materials. Kaimai Xiaobian also highly recommends that everyone use aluminum veneer curtain wall when decorating the exterior wall. I hope today's sharing will help you!



责任编辑:凯麦aluminum veneer curtain wallManufacturer-Huang Liping 13074271912

This article labels: aluminum veneer curtain wall, fluorocarbon aluminum veneer, curtain wall aluminum veneer, wood grain aluminum veneer, aluminum veneer manufacturer