铝扣板天花吊顶Key points of construction and installation一:安装次序 在Engineering aluminum gusset ceilingIn the process of construction and decoration, when installing the suspended ceiling of aluminum gusset plate, the suspended ceiling of the kitchen needs to fix the hose and flue of the range hood first, determine the position of the range hood, and then install the suspended ceiling. For the ceiling of the bathroom, the bath heater and the exhaust fan shall be installed first, and then the ceiling shall be operated. Be sure to arrange the pipes of the bath heater and the gas water heater first.