How to install the aluminum gusset plate aluminum strip gusset plate in the lobby of Grade A office building
Author: Camer metal ceiling aluminum curtain wall EDIT: Xiaojia 13074271912 Source: Release date: 2020.07.02
Information Abstract:
Kaime recommends aluminum strip gusset ceiling for Grade A office lobby. Ceiling saves time and effort. Grade A office lobby often uses unique aluminum strip gusset ceiling to decorate. Aluminum gusset ceiling should not only reflect high Grade A office building...

Aluminum gusset plate in lobby of Grade A office buildingHow to install aluminum strip gusset plate 

Kaimai recommends aluminum strip gusset ceiling for lobby ceiling of Grade A office building Save time and effort

甲级写字楼大堂往往都会选用造型别致的Aluminum strip gusset ceiling来装饰,Aluminum strip buckle吊顶的既要体现出高甲级写字楼大堂的庄严大气,又要迎合商务的简约时尚,更是利用Aluminum strip gussetCeiling ceiling lines should highlight the elegant and chic characteristics of Grade A office buildings, thus reflecting the sense of architectural quality. How is the aluminum strip gusset installed? The following is a small compilation Aluminum strip gussetInstallation steps:

18

The first step of installation of aluminum strip gusset ceiling ceiling in the lobby of Grade A office building: preparation tools

在安装Aluminum strip gusset ceiling Before the ceiling, you should first check the design drawings of the aluminum strip ceiling, so as to understand the specific locations of lamps and vents that need to be reserved, and pay attention to some details of the aluminum strip ceiling. The most important thing is to prepare in advance the installation needs to use the parts and all kinds of tools, such as raw material keel, boom, plate, etc., tools are hacksaws, screwdrivers, impact drills, nail guns, etc., parts including hanging plug-ins, hangers, connectors, nails, self-tapping screws, etc.

Step 2 of Ceiling Installation of Aluminum Strip Buckle Plate in Lobby of Grade A Office Building: Positioning Spring Line

对照Aluminum strip buckle ceiling设计图纸,在墙、顶面确定吊顶安装的具体位置并弹线定位了。根据楼层的标高水平线,利用标尺竖向量至顶面确定出标高位置,然后以房间中心点为基点,沿着标高水平,在墙面弹出Aluminum strip gusset ceiling Position line of keel sub-level. The aluminum strip buckle ceiling of the elastic line must ensure the clarity, and the deviation value of the position should not exceed±5mmSo that the aluminum bar buckle ceiling can be installed accurately.

Grade A office building lobby aluminum gusset ceiling installation step 3: closing corners

对于甲级写字楼大堂Aluminum strip gusset ceiling Generally, the edge-closing strip is also made of aluminum alloy, which is also called edge-closing corner aluminum or edge aluminum strip. Commonly used side aluminum strip specifications are generally25*25mmYes, as the sealing of the ceiling edge, the color needs to be consistent with the aluminum strip gusset ceiling plate to ensure the beauty of the entire aluminum strip gusset ceiling. The closing corner needs to be installed along the previously determined aluminum strip gusset ceiling elevation line and fixed with cement nails. The closing corner located at the corner of the wall needs to be installed according 45installed diagonally in degrees.

Grade A office lobby aluminum gusset ceiling installation step 4: install aluminum gusset ceiling boom

确定好主甲级写字楼大堂Aluminum strip gusset ceiling After the keel is located, determine the elevation of the lower end of the keel boom according to the position of the bullet line, and start to install the keel boom. When installing, it is necessary to punch holes in the top surface first, and fix the end of the aluminum buckle ceiling hanger rod without bolts on the top surface. Generally, expansion bolts are used for fixing, so it is necessary to ensure that the hole diameter is slightly larger than the diameter of the boom when drilling. The specific position of the aluminum strip gusset ceiling hanger rod in the lobby of Grade A office building needs to be determined according to the spacing of the main keel, and the lower ends of all hanger rods must be kept at the same height.

13

Grade A office lobby aluminum gusset ceiling installation step 5: install aluminum gusset keel

接下来便是Aluminum strip gusset ceiling The installation of smallpox keel, keel is divided into two kinds of main keel and secondary keel, need to install the main keel first. Assemble the hanger on the main keel first, and then connect and fix the hanger with the corresponding hanger bolt according to the position of the main keel sub-gear line determined before. Generally, the spacing of the main keel needs space in1200mmWithin, the position, height and levelness of the main keel need to be paid attention to during installation. If there is any problem, it needs to be adjusted and corrected in time.

Grade A office lobby aluminum gusset ceiling installation step 6: install aluminum gusset

Aluminum strip gusset ceiling After the installation of the main ceiling keel is completed, the aluminum strip gusset ceiling ceiling secondary keel needs to be installed. Same as the main keel of the aluminum strip gusset ceiling ceiling, the secondary keel needs to be installed first.CThe type hanger is assembled in the corresponding position. The specific position of the hanging parts needs to be determined according to the sub-gear line of the secondary keel and the spacing with the main keel. The general spacing is600mm . and then throughCThe type aluminum strip gusset pendant fixes the secondary keel on the main keel. If the secondary keels need to be connected to each other due to the length problem, a special connecting piece can be used for connection at this time to ensure that it is straight and then fixed.

During installation, it is necessary to first determine the reference line along the secondary keel at the middle position, and then extend the installation from the middle to both sides according to the position of the reference line. The installation method is relatively simple. Directly follow the flanging position of the aluminum gusset plate, gently clamp the plate into the secondary keel, and slowly push it tightly. For the side aluminum plate, it can be fixed by the clamping edge of the side aluminum strip. When installing the aluminum strip gusset plate, it must be handled with care to prevent the plate surface from being damaged and unable to be repaired.

如果您对以上Aluminum strip buckle ceilingIf you are interested in smallpox or have questions, please click to contact our online customer service or call: 13074271912, Kaimai Building Materials-Do a good job of ceiling with your heart!

 

 

 

Responsible editor: kaimai aluminum strip gusset ceiling manufacturer-Huang Liping13074271912

Labels for this article:Aluminum strip gusset,CAluminum strip buckle, Buckle aluminum ceiling,Kaimai aluminum strip gusset manufacturer