Do you know the simple and easy-to-operate aluminum grille installation method?
Author: Camer metal ceiling aluminum curtain wall EDIT: Xiaojia 13074271912 Source: Release Date: 2020.10.24
Information Abstract:
Aluminum grille is an open ceiling product. The structure of the main and auxiliary bones crisscrossed and buckled together forms a square grid pattern. The aluminum grille is generally 2 meters long, and the single root and the single root can be spliced together,...

简单易操作的Aluminum grilleInstallation, you know?

       Aluminum grilleIt is an open ceiling product. The structure of the main and auxiliary bones crisscrossed and buckled together forms a square grid pattern one by one. The aluminum grid is generally 2 meters long, and the single grid can be spliced with each other. Therefore, the length of the aluminum grid is not limited, and no matter how large the project area is, it can meet its size requirements.Aluminum grilleCeiling is widely used in some large occasions, such as airports, exhibition halls, subway stations, large shopping malls, supermarkets, hospitals, underground parking lots and so on. You can see the aluminum grille everywhere, so some people who are not in this industry will think that the way to install the ceiling will be very complicated. In fact, it is not. As long as you are ready to find the right method, the most difficult thing will become simple. Let Kaimai Xiaobian teach you the simple and easy-to-operate aluminum grille installation method!

Aluminum Grille Ceiling 49

       关于Aluminum grilleInstallation steps:

Step 1: Install the hanger bar

According to the floor elevation horizontal line, according to the design elevation, along the wall, pop up the ceiling elevation horizontal control line and keel sub-control line. And pay attention to whether there is any contradiction with the elevation of hydropower, and if there is any contradiction, solve it in time.

After playing the ceiling elevation horizontal line, determine the elevation of the lower end of the hanger rod, weld the upper part of the hanger rod with embedded steel bars or fix it into the structure roof with expansion bolts while drilling holes in angle steel, and weld it firmly with the hanger rod Ф 10 galvanized steel wire. After hanging the iron wire, thread the iron wire into the adjusting spring sheet, which is required to be galvanized. The vertical and horizontal spacing of the boom is about 1200mm.

The second step: pre-installed grille

Pipeline layout, calibration and painting in the shed: after installation and calibration of water and electricity pipelines in the ceiling, black paint shall be painted on the structural ceiling and pipelines for 1-2 times. Separate the grid ceiling (110*110) strips of specifications underground first, and pre-assemble them into groups according to their specifications. Pay attention to the smooth and clean ground, and check the splicing flatness and firmness of the joist.

Aluminum Grille Ceiling 52

Step 3: Lifting the grille

       将预装好的每组Aluminum grilleThe ceiling is mounted on a galvanized iron wire hook with a diameter of Ф 4mm, one end of the hook is inserted into the main bone hole, and one end is fixed on the spring plate. Each set of joists connects each raster bar by a dedicated connector.

Step 4: Leveling

After connecting the whole grid ceiling, straighten the wire at the bottom of the joist according to the control line on the wall, and adjust it to the required level by adjusting the spring sheet.

Step 5: Install the side keel

Installation of side keels: embed anti-corrosion wooden wedges around the wall according to the ceiling elevation line and fix 25*25 side keels with cement nails, with a fixed spacing of not more than 400mm, and the joint angle of yin and yang angles of side keels is 45, requiring that the side keels should be fixed firmly and smoothly.

       看到这里,是不是也想蠢蠢欲动自己尝试Aluminum grilleI believe you have a clearer logic about the installation of aluminum grille, so let\'s do it!

 



责任编辑:凯麦Aluminum grilleCeiling manufacturers-Huang Liping 13074271912

This article labels: aluminum grille ceiling, triangular aluminum grille, aluminum grille manufacturer, aluminum grille ceiling