凯麦为您解说Aluminum veneerWhat should be paid attention to when installing
Aluminum veneerMainly after chromium treatment, the use of fluorocarbon spraying technology for processing the formation of building decoration materials. It is mainly composed of panels, stiffeners, corner codes and other components in the structure, so we need to pay special attention when installing. So,Aluminum veneerWhat matters should be paid attention to during installation? Next, let\'s follow Kaime Xiaobian to learn about it!
1, aluminum veneer and accessories with elevators and other vertical transport equipment to each construction point.
2Clean the side of the aluminum plate against the interior and the surface of the column frame with cleaning agent.
3、整块Aluminum veneerThrough the four sides of the aluminum angle code (Hanging Ear)Connected with the keel, fixed on the keel.
42. Fixing method: If there is no seam splicing in the interior, then an electric drill can be used to turn the hole at the corresponding position of the keel, and then the flat head aluminum nail can be used to rivet it. If the plate is equipped with glue seam outside, then the screw with steel turning tail needs to be drilled directly into the keel to fix the aluminum plate, but special attention should be paid to controlling the tightness of the drill bit and adjusting the aluminum plate.
5、对于Aluminum veneerIn the assembly of the approach, it is necessary to fix the aluminum plate on the keel first, pay attention to the need to control the installation accuracy, and finally adjust the plate before tightening.
61. When installing aluminum veneer, install it on the wall according to the number of aluminum veneer.
71. Aluminum veneer installation starts from the front, large area and corner parts, and the principle of installation from top to bottom.
81. The connection between aluminum veneer and keel shall conform to the drawing requirements, be firm and reliable, and install bolts.
91. Curtain wall corners and surrounding walls, connection structure of upper and lower seals and treatment of deformation joints shall meet the design requirements.
10Node structure and closing treatment
① Wallboard node: basically, it is easy to have the problem of uneven up and down or uneven board surface on the joint joint, so it is necessary to install one side of the board first, and then position the alignment line. It is better to use horizontal and vertical control lines to determine the installation position of the other side of the board, so that after both sides of the board meet the requirements, the willow nails are pulled in turn and the pressure plate is installed and fixed;
② deal with the closing at the lower end of the wall, make the water baffle according to the actual size, and then seal the lower end, and also cover the gap between the board and the wall to prevent rainwater from penetrating into the room;
11During installation, pay attention to the gap between the plates and the height requirements at the panel interface.
12After the aluminum veneer is installed, cover and protect the parts that are easy to be contaminated with plastic film or other materials.
Aluminum veneerProfiles have a highly respected position in architectural decoration materials. Kaimai Xiaobian also highly recommends that you use aluminum veneer curtain wall when decorating exterior walls. I hope today's sharing will help you!
责任编辑:凯麦aluminum veneer curtain wallManufacturer- Huang Liping13074271912
This article label: aluminum veneer curtain wall,Fluorocarbon aluminum veneer,curtain wall aluminum veneer ,wood grain aluminum veneer,Aluminum veneer manufacturers
All rights reserved(Kaimai metal ceiling aluminum curtain wall) reproduced please indicate the source
本文标签: Aluminum veneer curtain wall Fluorocarbon aluminum veneer curtain wall aluminum veneer wood grain aluminum veneer Aluminum veneer manufacturers