凯麦建材提醒EngineeringAluminum gusset ceilingKey points of construction and installation
Engineeringaluminum gusset platesuspended ceilingConstructionInstallation points one:Installation order
在EngineeringAluminum gusset ceilingIn the process of construction and decoration, when installing the suspended ceiling with aluminum gusset plate, the suspended ceiling of the kitchen needs to fix the hose and flue of the range hood first, determine the position of the range hood, and then reattach the ceiling. ;For the ceiling of the bathroom, install the bath heater and exhaust fan first, and then operate the ceiling. Be sure to arrange the pipes of Yuba and gas water heater first.
Key points of construction and installation of aluminum gusset ceiling in the project II: drilling depth
在EngineeringAluminum gusset ceilingWhen installing aluminum alloy doors and windows, it is necessary to punch holes to fix them. Light steel keel shall be used on the square plate, while aluminum keel or galvanized keel shall be used on the strip plate. According to the guidance of the measured construction drawing, the drilling depth shall be 3~4cmIt is appropriate to prevent damage to the wire tube and waterproof layer. After drilling the hole, the following operations can be carried out.
Key points of construction and installation of aluminum gusset ceiling in the project III: installation size
In the construction and decoration of aluminum gusset ceiling, installationAluminum gusset ceilingIt should be noted that the installation workers must be told the size of the lamp and the positions of the bath heater and the row before installation, so as to facilitate the workers to determine the positions where holes are needed. . Yuba\'s keel should be installed by itself, or some relatively simple wooden frames should be made and the installation size should be determined before it can be carried out well.
Engineering aluminum gusset plate ceiling construction installation points four: keel spacing
EngineeringAluminum gusset ceilingConstruction在做Aluminum gusset ceilingWhen installing, it is necessary to pay great attention to the spacing between the keels, and arrange the keels well according to the size of the aluminum gusset plate. The spacing is about 50~60cmbetween, the boom should be from the end of the main keel30cm Below, if not, a boom should be added to avoid falling of the ceiling.
Key points of construction and installation of aluminum gusset ceiling in the project: panel connection
在EngineeringAluminum gusset ceilingConstruction安装Aluminum gusset ceilingAt the same time, it should be noted that the connection between the panel and the keel needs to be tight, and attention should also be paid to the smoothness of the surface and whether the joints are uniform. In addition, attention should be paid to whether there is any pollution, folding, lack of edges and corners, and whether there is any hammer injury, delamination, leakage, penetration and warping. The gap between the corner line and the wall must be small and uniform.
如果您对以上EngineeringAluminum gusset ceilingIf you are interested in materials or have any questions, please click to contact our online customer service or call: 13074271912, Kaimai Building Materials-Do a good job of ceiling with your heart!
Responsible editor: kaimai aluminum gusset ceilingManufacturer-Huang Liping
13074271912
本文标签:Aluminum gusset ceiling,
Office aluminum gusset ceiling,Engineering aluminum gusset ceiling
All rights reserved(Kaimai metal ceiling aluminum curtain wall) reproduced please indicate the source
本文标签: aluminum gusset plate Engineering aluminum gusset plate Punched aluminum gusset Aluminum gusset ceiling manufacturers
National Service Hotline
Advisory Hotline