关于Aluminum gusset ceilingThe correct process of construction and installation
Aluminum gusset ceilingKey points of ceiling construction and installation: installation sequence
In the construction and decoration process of the aluminum gusset ceiling of the project, when installing the aluminum gusset ceiling, the kitchen ceiling needs to fix the hose and flue of the range hood first, determine the position of the hood, and then use the ceiling again. For the suspended ceiling of the bathroom, install the bath heater and exhaust fan first, and then operate the suspended ceiling. Be sure to arrange the pipes of Yuba and gas water heater first.
工程Aluminum gusset ceilingKey points of construction and installation: drilling depth
When installing aluminum alloy doors and windows in the construction of aluminum gusset ceiling, it is necessary to punch holes for fixing. Light steel keel is applied on the square plate, while aluminum keel or galvanized keel is used on the strip plate. According to the guidance of the measured construction drawing, the drilling depth should be between 3~4cm to prevent damage to the wire tube and waterproof layer. After the hole is made, the following operations can be carried out.
工程Aluminum gusset ceilingConstruction and installation points three: installation size
在工程Aluminum gusset ceilingDuring the construction and decoration, attention should be paid to the installation of aluminum gusset ceiling. Before installation, the installation workers must be informed of the size of the lamp, the location of the bath heater and the row, so as to facilitate the workers to determine the location where the holes need to be opened. Yuba\'s keel should be installed by itself, or some relatively simple wooden frames should be made and the installation size should be determined before it can be carried out well.
工程Aluminum gusset ceilingConstruction and installation points four: keel spacing
工程Aluminum gusset ceilingWhen installing the suspended ceiling of the aluminum gusset plate, great attention should be paid to the spacing between the keels. The distance between the keels should be well arranged according to the size of the aluminum gusset plate. The spacing is about 50 ~ 60cm. The suspender should be less than 30cm from the end of the main keel. If not, the suspender should be added to avoid falling of the suspended ceiling.
工程Aluminum gusset ceilingConstruction and installation points five: panel connection
When installing aluminum gusset ceiling in the construction of engineering aluminum gusset ceiling, attention should be paid to the tight connection between the panel and the keel, and attention should also be paid to the smoothness of the surface and whether the joints are uniform. In addition, attention should be paid to whether there is any pollution, folding, lack of edges and corners, and whether there is any hammer injury, delamination, leakage, penetration and warping. The gap between the corner line and the wall must be small and uniform.
If you are interested in the above worksAluminum gusset ceilingIf you are interested in materials or have questions, please click to contact our online customer service, or call: 13074271912, kaimai building materials-make the ceiling carefully!
Responsible editor: kaimai aluminum gusset ceiling manufacturer-Huang Liping 13074271912
This article labels: aluminum gusset ceiling, office aluminum gusset ceiling, engineering aluminum gusset ceiling
Copyright (Kaimai metal ceiling aluminum curtain wall) reproduced please indicate the source
本文标签: aluminum gusset plate Engineering aluminum gusset plate Punched aluminum gusset Aluminum gusset ceiling manufacturers
National Service Hotline
Advisory Hotline