关于aluminum gusset plateInstallation steps
相信很多客户在购买到aluminum gusset plateAfter the material, I still don\'t know about the installation. Installation is a key step, which determines your overall visual effect. Regarding the installation steps of aluminum gusset plate, let Kaimai Xiaobian talk to you about it!
1, the bullet line: according to the height of the house along the ceiling pop-up horizontal line, draw the keel installation position.
2. Install the boom: After playing the thread, fix the boom on the roof with expansion bolts.
3. Installation of keel: the main keel is generally light steel keel, and the installation spacing is generally 1200mm. The secondary keel card is placed on the main keel, and the spacing is generally 600mm.
4、安装aluminum gusset plate:顺着翻边部位顺序轻压,将aluminum gusset plateAfter both sides are completely stuck into the secondary keel, push it tightly again.
5、清理:aluminum gusset plateAfter installation, the board surface shall be wiped clean with cloth without dirt and fingerprints.
6、各种穿管与aluminum gusset plate的接缝问题。比如烟机软管、下水管、燃气管等。原则就是能先布管的一定先布置好,能在吊顶内部走的绝对别留在外面。比如烟机软管,让Manufacturer先来布管,这样方便aluminum gusset plateThe installation master went to deal with the sewing problem.
7、各种电器设备与Aluminum gusset ceilingof the relationship. At present, the height of residential houses is limited. If you want to install an electric water heater to the toilet, you can consider it.Aluminum gusset ceilingIn the form of half a bag, let the water heater stay half of the body into the ceiling, so as to maximize the height of the room.
责任编辑:凯麦Aluminum gusset ceilingManufacturer-Huang Liping 13074271912
This article label: aluminum gusset ceiling,办公室Aluminum gusset ceiling,工程Aluminum gusset ceiling
All rights reserved(Kaimai metal ceiling aluminum curtain wall) reproduced please indicate the source
National Service Hotline
Advisory Hotline